The sections mentioned below contain notes on the following applications in detailed assessment proceedings:
• for assessment before conclusion of main proceedings (Section 10)
• for an order setting aside a default costs certificate (Section 22)
• for an interim costs certificate (Section 23)
• for permission to appeal (Section 30)
• for correcting accidental slips or omissions in certificates (Section 7)
• for sanctions for failure to commence in time (Section 24), and
• for a wasted costs order (Section 25)